| Lake Cumberland Dam (drawdown) issues Stay up to date on the effects or the work on the dam on the fishing, the lake and the Cumberland River below the dam. Post photos of the lake. |
![]() |
|
|
Thread Tools | Display Modes |
|
#1
|
|||
|
|||
|
This from LC.com
New Update on Dam CLICK FOR REPORTConstruction Report Water Management Report The suspension of construction in Critical Area 1 has been extended until at least 25 Jun as we collect soil data and install inclinometers and piezometers on the upstream embankment. The information obtained will be used to update the evaluation of the embankment stability. The majority of this work is along a newly constructed access ramp in the wraparound section where the embankment ties into the concrete section of the dam. Recent heavy rainfall caused the lake to rise higher than the access ramp which is at elevation 695. Work is expected to resume as the lake falls below the ramp elevation which should be about 26 May. Construction continues on the remainder of the project. Contractor Treviicos Soletanche JV is currently conducting the following activities: Excavating Protective Concrete Barrier Wall (PCEW) panels (151 of 430 complete). Directional drilling of pilot holes in Technique Areas 1, 2 and 2 Extension (67 of 83 complete). Drilling 50-inch diameter piles in Technique Areas 1, 2 and 2 Extension (24 of 83 complete). Excavating Combined Barrier Wall panels in Technique Areas 1, 2 and 2 Extension (3 of 17 complete). Drilling Arapuni secant piles in Technique Areas 1 a |
![]() |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
|
|