Lake Cumberland Dam (drawdown) issues Stay up to date on the effects or the work on the dam on the fishing, the lake and the Cumberland River below the dam. Post photos of the lake.

Reply
 
Thread Tools Display Modes
  #1  
Old 05-18-2010, 05:49 PM
PRO V LE PRO V LE is online now
Senior Member
 
Join Date: Dec 1969
Location: .Taylor Mill Ky.
Posts: 472
Default 05/18/10 update

This from LC.com
New Update on Dam


CLICK FOR REPORTConstruction Report
Water Management Report


 The suspension of construction in Critical Area 1 has been
extended until at least 25 Jun as we collect soil data and
install inclinometers and piezometers on the upstream embankment.
The information obtained will be used to update
the evaluation of the embankment stability.
 The majority of this work is along a newly constructed access
ramp in the wraparound section where the embankment
ties into the concrete section of the dam.
 Recent heavy rainfall caused the lake to rise higher than the
access ramp which is at elevation 695. Work is expected to
resume as the lake falls below the ramp elevation which
should be about 26 May.
Construction continues on the remainder of the project. Contractor
Treviicos Soletanche JV is currently conducting the following
activities:
 Excavating Protective Concrete Barrier Wall (PCEW) panels
(151 of 430 complete).
 Directional drilling of pilot holes in Technique Areas 1, 2
and 2 Extension (67 of 83 complete).
 Drilling 50-inch diameter piles in Technique Areas 1, 2 and 2
Extension (24 of 83 complete).
 Excavating Combined Barrier Wall panels in Technique Areas
1, 2 and 2 Extension (3 of 17 complete).
 Drilling Arapuni secant piles in Technique Areas 1 a
Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 12:50 PM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.